1111 S FIGUEROA ST, Los Angeles, CA 90015 · Los Angeles · 51 total events
Call
Call
*eplan*INTERIOR TENANT IMPROVEMENT OF EXISTING ARENA BUILDING. THE PROJECT SCOPE INCLUDES THE INTERIOR DESIGN OF THE 7,600SF NHL HOME TEAM SHELL SPACE (SHELL SPACE PCIS #23016-20000-42684) ON THE EVENT LEVEL. SCOPE OF THE INTERIOR DESIGN INCLUDES LOCKER ROOMS, SHOWERS/TOILETS, OFFICES, LOUNGE, AND STORAGE (ALL THE SAME SPACES ORIGINALLY CONSTRUCTED IN THE EXISTING BUILDING, DEMOLISHED IN SHELL SPACE PCIS #23016-2000-42684, AND RELOCATED IN THIS INTERIOR TI SCOPE OF WORK). NO ADDED SQUARE FOOTA
Supplemental permit to # 22048-30000-01762 for changes to the sign dimensions ; Illuminated Channel Letter Wall Sign AS.04 (9'-1" x 68'-7")
Supplemental permit to # 22048-30000-01515 for changes to the sign dimensions ; Illuminated Channel Letter Wall Sign AS.02 (13'-6" x 101'-11 1/2") ; AS.03 (4'-2" x 40'-6") ; AS.05 (13'-6" x 101'-11 1/2") ; AS.06 (4'-2" x 40'-6") ; AS.07 (4'-2" x 40'-6")
Supplemental ref to pcis # 22020-30000-02733, for structural revisions to the sign support frame
*ePlan*Reconfigure existing Locker Rooms. This T.I. Remodel includes new finishes and flooring materials, new ceilings, interior window and door replacements.
T.I. OF (E) ARENA: ENLARGEMENT+RELOCATION OF (E) LOCKER ROOMS (NHL VIS. TEAM+NBA VIS. TEAM), RELOCATION OF (E) SUPPORT SPACES (XRAY, WEIGHTROOM+LAUNDRY), REDUCTION OF STORAGE ROOMS, REMOVAL OF (E) CLIPPER LOCKER ROOM, WORK ALSO INCLUDES THE PERIMETER WALLS OF NHL+NBA HOME SHELL SPACE.
SUPPLEMENTAL TO 22048-30000-01762 TO CHANGE THE HEIGHT FROM GRADE OF OREVIOUSLY APPROVED SIGN FROM 41'-10 1/2" TO 39'-0" AND TO CHANGE THE ENGINEER OF RECORD.
**ePlan****Supplemental to 24016-20000-00475 for Main Concourse Refresh in Crypto.com Arena (Scope #7 from master chart for Phase 3 renovation projects).Due to reduction in scope, Revise the floor layout and ADA features. SW VIP lobby renovation and the new Tunnel Club (under separate application) have been removed from the project. There is no impact on project valuation as the change is reduction.
Deferred submittal for Sentech Curtainwall System at the City View Terrace at Crypto Arena, which was approved under permit# 23016-20000-42678.
EplanReplace the existing center display and upgrade the current hoist to accommodate a larger hoist system.
**ePlan**INTERIOR NON-STRUCTURAL TI IN EXISTING ARENA BUILDING ( CRYPTO.COM ARENA). RENOVATIONS TO TWO EXISTING CLUB DINING/BARS AND TWO EXISTING RESTROOMS. RELOCATION OF A PANTRY AND JOINING FO TWO EXISTING CLUB SPACE INTO ONE CONTIGUOUS SPACE.
ePlanINTERIOR TENANT IMPROVEMENT / ALTERATION OF EXISTING ARENA BUILDING. THE PROJECT SCOPE INCLUDES A NEW INTERIOR CITY VIEW TERRACE CLUB (CVT) WHICH INCLUDES THE REMOVAL OF UPPER SEATING BOWL SEATS(REMOVAL OF 327 SEATS FROM SECTIONS #325, 326, 327,328) FOR THE NEW CLUB (2,830SF) WITH 128 TICKETED SEATS(FIXED SEATS AND DRINK RAILS). THE NEW PROJECT CREATES A NET REDUCTION OF 199 OCCUPANTS ON THE UPPER SEATING BOWL. THE EXTERIOR RENOVATION INCLUDES THE REPAIR OF TOPPING SLAB ON EXISTING EXTERIO
** ePlan ** CRYPTO.COM ARENA PHASE 7 - 2024,UPGRADING OF CONCOURSE FINISHES AND RESTROOMS IN MAIN CONCOURSE, REMOVE (E) RAMPS, BUILD (N) PLATFORM FOR (N) WHEELCHAIR LIFT.
Supplemental permit to 22048-30000-01223 to capture the clearance approval per new ordinance.
Supplemental permit to (ref. 22016-10000-09456) revise restroom plans.
**SUPPLEMENTAL TO 23016-20000-02158 TO CORRECT THE A4 OCCUPANT LOAD IN STRUCTURE INVENTORY FROM "+101" TO "-112"** NO FEES, DEPT ERROR"
**Supplemental to 23016-20000-02158. New tenants in two suites (TS-01 and TS-02) at Main Concourse install new finishes/ casework/ ceiling geometry. All egress components (Aisle steps/ Wheelchair lift/ Entry door) are not changed from the originally permitted plan.
T.I. TO THE EXISTING COVENIENT STORE AT GROUND FLOOR FOR NEW GRAB AND GO SNACK AND BEVERAGE. PROVIDE NEW WALL, LIGHTING, POWER, WALK IN REFRIGERATOR. NO CHANGE OF USE.
**ePlan** Supplemental to 22016-20000-38084**Enlargement to the Pressroom workstation room. The existing restrooms (previously "existing to remain") now are being demolished and relocated to a new location within the Pressroom. The AV room and Elevator Machine Room have been relocated. AV room moved within the Pressroom to a long closet and the 1 hr. rated Elevator Machine Room moved to the Main Concourse (top stop of elevator). Other changes include minor clarifications required during the
T.I. ON (E) 3,450 SQ FT GROUND FLOOR RETAIL SPACE. PARTIAL WORK INCLUDES DEMOLITION, NEW PARTITION, ADDITIONAL LIGHT FIXTURE, NEW RESTROOM.
Add lower bowl seating: replacement of supplus wheelchair positions with fixed seats to update and comply to current code. the lower bowl seating section will be expanded
*eplan*PHASE 1 - INSTALLATION OF NEW CONCRETE INFILL WALL BETWEEN THE TWO EXISTING RING BEAMS. EXISTING FRAMING TO REMAIN AS-IS. NEW STUCTURAL WORK IS LOCATED WITHIN EXISTING UNOCCUPIED VOID SPACE. NO CHANGE TO EXISTING FLOOR LAYOUT OR EGRESS.
*eplan" ** CRYPTO.COM ARENA PHASE 2023, UPPER CONCOURSE REFRESH IS AN INTERIOR RENOVATION FOR UPGRADING OF CONCOURSE FINISHES AND RESTROOMS AT UPPER CONCOURSE.
**eplan: ** CRYPTO.COM ARENA REFRESH 2023, INTERIOR REMOVATION FOR DEVELOPMENT OF FOUR (4) TERRACE SUITES AT THE MAIN CONCOURSE LEVEL. SCOPE INCLUDES MODIFICATION OF EXISTING SEATING TIER AND NEW INTERIOR FINISHES AND FF&E FOR THESE SPACES.
**eplan" ** Interior tenant improvement / alteration of existing arena building: -new suites (4), kitchen, entry lobby to replace existing locker room, offices, and storage rooms within level 100 (event level). -finish replacement and rearrangement of existing pressroom dining, buffet, and pantry on level 100 (event level). -new access to new seats (via stair and lula elevator) within existing seating bowl on level 200 (main concourse). -new mechanical shaft at guest service room on level 200. -
Installation of 5 Signs Total: Install 3 Illuminated Channel Letter Wall Sign (AS.03, AS.06, AS.07): 40'-6" x 4'-2" each, Install 2 Illuminated Channel Letter Wall Sign (AS.02,AS.05): 101'-11 1/2" x 13'-6"- each on a Frame Attached to the Building Frame under Seperate Building Permit.
New steel frames to support signs (AS.02 ; AS.03 ; AS.05 ; AS.06 ; AS.07) under permit # 22048-30000-01515
Install (1) Illuminated Channel Letter Wall Logo, AS.04: 68' - 7" x 9' - 1", Height at Grade: 41.88ft, Sign Area: 482sq.ft
install (1) illuminated channel letters rooftop sign 301' 7" x 40' 0", 9343.30 sf per engineer
Interior alteration to (E) sports arena which include tenant improvements to install a new family room within an (E) storage space (2 of 2).
Interior alteration to (E) sports arena which include tenant improvements to finishes at all suite level concourses and restrooms (1 of 2).
Interior alteration to (E) sports arena which include tenant improvements to restrooms, circulation spaces, and bar/kitchen spaces.
Tenant Improvement to (E) restaurant within (E) Sports Arena Building
Replacement of LED Fascia Boards and addition of (N) LED Boards and catwalks within (E) Sports Arena Building
install (4) temporary non-illuminated wall signs
INSTALLATION OF A DISTRIBUTED ANTENNA SYSTEM INCLUDING ANTENNAS, RRUS, ANTENNA FRAMES AND CABLES ON ROOF. NEW EQUIPMENT RACKS. (8) PARAPET MOUNTED ANTENNAS (4 PER SECTOR)(8) PARAPET MOUNTED RRU'S (4 PER SECTOR)
SUPPLEMENTAL PERMIT TO PERMIT 16016-10000-05190 TO REVISE STRUCTURAL DETAILS FOR INSTALLATION OF VERIZON WIRELESS DAS (DISTRIBUTED ANTENNA SYSTEM) AND RRU IN THE EXISTING ELCTRICAL ROOM. UPDATE ENGINEER OF RECORD.
Other
AMIN LOBBY EXPANSION AND TENANT IMPROVEMENT. INCLUDES NEW CURTAIN WALL, SELECTIVE DEMOLITION AND NEW FINISHES IN (E) LOBBY.
MODIFICATION TO EXISTING ROOFTOP WIRELESS SITE PER ZA 99-0568(CUZ)(PA1).
Graffiti Removal
Graffiti Removal
Graffiti Removal
Graffiti Removal
Graffiti Removal
Graffiti Removal
Graffiti Removal
Graffiti Removal