10250 W CONSTELLATION BLVD, Los Angeles, CA 90067 · Los Angeles · 29 total events
Eplan T.I. ALTERATIONS OF EXISTING 25TH FLOOR COMMON AREAS, CORRIDOR & TENANT SUITES WITHIN EXISTING 35 STORY BUILDING. SCOPE OF WORK INCLUDES: NEW NON-RATED CORRIDOR & TENANT DEMISING WALLS INCLUDING NEW SUITE ENTRY & EXITS THAT LEADINTO CORRIDOR SPACE. NEW FINSIHES & LIGHTING THROUGHOUT FINISHED CORRIDOR SPACE & ELEVATOR LOBBY. DRINKING WATER FOUNTAIN TO BE REPLACED AT EXISTING LOCATION WITHIN CORRIDOR.
(ePLAN) Interior tenant improvement to existing office at 7th and 8th floor. Work to include new stairway connecting 7th and 8th floor only. Work per architectural details.
eplan, Deferred submittal of light gauge metal framing for interior T.I. per scope under permit number 24016-10000-34876 (10th and 11th floors).
Deffered Submittal Permit to 24016-10000-26956 for structural support for Overhead Fire Shutter.
eplan,Defer submittal to permit number 24016-10000-34876, Structural Framing for Skyfold Partition Support.
Supplemental to 24016-10000-34881 for Deferred submittal of engineering of light gauge/cold-form metal framing.
Council's Office
SUPPL. PERMIT TO 24016-10000-26957. INCLUDE STRUCTURAL PLANS AND DETAILS.
MINOR RE-STRIPE AND INSTALLATION OF 21 NEW EV CHARGING STATIONS THROUGHOUT SITE.NO CHANGE TO TOTAL REQUIRED PARKING.
EARLY START INTERIOR DEMO FOR 2ND AND 10TH FLOORS.
REMODEL TO EXISTING MEDIA VIEWING ROOM OF EXISTING OFFICE BUILDING
SCOPE OF WORK IN SUITE 1640 ON THE 16TH FLOOR, CONSISTS OF DEMOLITION OF NON STRUCTURAL ELEMENTS. SCOPE INCLUDES CONSTRUCTION OF NEW INTERIOR PARTITIONS, DOORS, CEILINGS, LIGHTING AND FINISHES.
EPLAN: Alteration to garage level of existing High Rise building to add valet service area.
RESTRIPE EXISTING PARKING SPACES, MAKING MODIFICATIONS TO ACCESSIBLE PARKING SPACES. ADDITION OF NEW TRUNCATED DOMES. REPLACE ACCESSIBLE PARKING SIGNS WITH NEW. ACCESSIBLE PARKING MODIFICATIONS RESULT IN THE ADDITION OF 3 PARKING SPACES.
SUPPLEMENTAL TO 23016-10000-10435 FOR DOOR CHANGES
148 SF NON STRUCTURAL INTERIOR OFFICE TI FOR A WALL OPENING EXPANDING INTO THE ADJACENT SUITE AND A CHANGE OF THE DOORS AND WALLS IN THE CORRIDOR.
ePlan: Office T.I including new non-bearing partitions, millwork, doors, fixtures and ceiling.
**EPLAN**INTERIOR TENANT IMPROVEMENT AT 18TH FLOOR (AREA OF WORK: 375 SF) INCLUDING New non-load bearing interior partitions, power, lighting and finishes.
*ePlan Check* Application for an early start interior demolition permit for plan check #B20LA19807, permit application 20016 - 10000 - 27333.Demolition of millwork, partitions and suspended ceiling at Suite 3050.
ePlan Tenant Improvement work on approx 4,700 SF of the total floor area. Demolishing existing interior partitions, power, lighting and finishes.MEP under separate permit
ePlan TENANT IMPROVEMENT TO (E) OFFICE (9515 SF)
INTERIOR NON-STRUCTURAL DEMOLITION AND OFFICE IMPROVEMENT OF THE 28TH FLOOR. NEW NON LOAD-BEARING PARTITIONS, CEILINGS, FINISHES, AND INTERIOR DOORS. THE AREA OF WORK IS 6,897 SF. (NO CHANGE OF USE) PLUMBING, ELECTRICAL, AND HVAC UNDER SEPERATE PERMIT.
INTERIOR TENANT RENOVATION OF 3,380 SF TO INCLUDE DEMOLITIONOF NON-LOAD BEARING PARTITIONS, POWER/DATA OUTLETS, CEILING LIGHTS, FLOOR AND CEILING FINISHES, AND THE REPLACEMENT OF NEW NON-LOAD BEARING PARTITIONS, NON-LOAD BEARING GLAZING PARTITIONS, DOORS AND FLOOR AND CEILING FINISHES.
T.I. REMODEL TO MODIFY EXISTING INTERIOR WALLS FOR (E) OFFICE SPACE.
TENANT IMPROVEMENT WORK ON +/- 2,848 SQ.FT. OF THE TOTAL FLOOR AREA. PARTIAL CEILING WORK ONLY IN SUITE 2820 APPROX.
RENOVATION OF AN EXISTING EXTERIOR OPEN AREA AT THE GROUND FLOOR OF AN OFFICE TOWER. SCOPE INCLUDES INSTALLATION OF GLAZED WIND SCREENS TO PARTIALLY ENCLOSE AN EXTERIOR LOUNGE AREA. NEW PLANTINGS AND FURNITURE WILL BE INSTALLED TO ACCOMODATE TENANT GATHERING/SPECIAL FUNCTIONS ADJACENT TO THE EXISTING BUILDING. STRUCTURAL MODIFICATIONS FOR THE SUPPORT OF GLAZED PANELS FROM THE EXISTING BUILDING IS INCLUDED. CONVENIENCE ELECTRICAL AND WIFI ALSO WILL BE PLACED IN THIS AREA.
TI ON LEVEL 7 AND 12 OF AN EXISTING OFFICE (B OCCUPANCY) SPACE IN AN EXISTING 35 STORY OFFICE TOWER. SCOPE INCLUDES DEMOLITION OF NON-STRUCTURAL PARTITIONS, CONSTRUCTION OF NEW NON-BEARING PARTITIONS, CEILING SYSTEM WITH NEW LIGHTING DOORS AND FRAMES, POWER AND COMMUNICATION, FIXTURES AND FURNITURE SYSTEMS, CARPET AND PAINT FINISHES
PROPOSED SITE GRADING FOR NEW LANDSCAPE ZONE AND SIDEWALK CONSTRUCTION.CUT = 209 CU. YDS., FILL = 111 CU. YDS., EXPORT = 120 CU. YDS.
Single Streetlight Issue